Skip to content

Commercial EV Charging in Cheyenne, WY

Commercial EV Charger Installation in Cheyenne

Level 2 and Level 3 EV charging stations for commercial properties, employee parking, and customer-facing retail locations. Installed by a licensed master electrician with commercial three-phase expertise.

Commercial EV charging station installation by Moonlight Electric Solutions, WY and CO

EV Charging Expertise

Commercial EV Charging Solutions

Electric vehicle adoption is accelerating across Wyoming, and Cheyenne businesses that install commercial EV charging stations now are positioning themselves ahead of the curve. Moonlight Electric Solutions installs Level 2 and Level 3 (DC Fast Charging) stations for commercial properties including office complexes, retail centers, hotels, restaurants, multifamily housing, and fleet operations throughout southeastern Wyoming.

Unlike general electricians who install a charger and leave, our approach begins with a thorough electrical infrastructure assessment. Commercial EV charger installation requires careful evaluation of existing panel capacity, service amperage, conductor sizing, and utility transformer capacity. A single Level 3 DC fast charger can draw 100 to 350 amps, which may require a dedicated transformer and utility service upgrade. Isaac Garcia’s experience with three-phase commercial power systems ensures that every installation is properly engineered from the utility meter to the charging pedestal.

We install and service all major commercial EV charging brands including ChargePoint, Blink, Tesla Wall Connector and Destination Charger, Enel X (JuiceBox), and ABB. Whether you need a single Level 2 charger for employee parking or a multi-station DC fast charging plaza for a travel center on Interstate 25, Moonlight Electric has the commercial electrical capability to deliver the project safely, efficiently, and to code.

Commercial EV charger installation is fundamentally an electrical engineering challenge. Panel capacity, conductor sizing, and utility coordination determine the success of every installation. That is where our commercial expertise makes the difference.

Cheyenne sits at the intersection of Interstate 25 and Interstate 80, making it a critical node in Wyoming’s emerging EV charging network. Hotels, gas stations, restaurants, and retail businesses along these corridors have a compelling opportunity to attract EV-driving travelers by offering charging amenities. We work with commercial property owners to identify optimal charger placement, select the right charging equipment for their business model, and install the complete electrical infrastructure from panel to pedestal.

For property managers and landlords operating multifamily housing or commercial office space, tenant EV charging is rapidly becoming a competitive amenity. We design scalable charging installations that start with a few stations and include conduit routing and panel capacity for future expansion as demand grows within your property.

Charging Solutions

Commercial EV Charger Types and Applications

01

Level 2 Commercial Chargers

208/240V charging stations delivering 7.2 to 19.2 kW. Ideal for employee parking, multifamily housing, hotels, and retail locations where vehicles park for several hours. Adds approximately 25 to 65 miles of range per hour of charging.

02

Level 3 DC Fast Chargers

480V three-phase DC fast charging stations delivering 50 to 350 kW. Designed for highway travel centers, fleet depots, and high-turnover retail locations. Charges most EVs to 80% in 20 to 45 minutes depending on vehicle capability.

03

Workplace Charging Programs

Multi-station installations for employee parking areas with networked load management. We design systems that share available power across multiple chargers, maximizing the number of stations without requiring expensive service upgrades.

04

Fleet Charging Depots

High-capacity charging infrastructure for commercial vehicle fleets transitioning to electric. We plan depot layouts, size electrical service for simultaneous charging, and install load management systems that optimize charging schedules around utility rate structures.

05

Revenue-Generating Stations

Networked charging stations with payment processing for businesses looking to generate revenue from EV charging. We install and configure ChargePoint, Blink, and other networked platforms with credit card readers and mobile app integration.

06

Panel and Service Upgrades

Many commercial EV charger installations require electrical service upgrades to support the additional load. We handle panel swaps, service entrance upgrades, transformer coordination with Rocky Mountain Power, and all associated permitting.

Installation Process

How We Install Commercial EV Chargers

01

Site and Electrical Assessment

We evaluate your property’s existing electrical infrastructure including panel capacity, service amperage, transformer size, and conductor routing. This assessment determines whether your current service can support EV chargers or if upgrades are required.

02

Equipment Selection and Design

Based on your business needs and electrical capacity, we recommend specific charger models, station quantities, and placement locations. Our design includes conductor routing, conduit paths, and future expansion provisions.

03

Permitting and Utility Coordination

We handle all permit applications through the City of Cheyenne building department and coordinate any required utility service upgrades with Rocky Mountain Power. For Level 3 installations, this often includes transformer sizing and dedicated metering.

04

Installation and Activation

Our licensed electricians install all electrical infrastructure, mount the charging equipment, and commission the stations. We configure networking, payment processing, and monitoring software. A final walkthrough covers operation, maintenance, and reporting features.

Frequently Asked Questions

Commercial EV Charger FAQs

How much does a commercial EV charger installation cost?

Commercial EV charger installation costs depend heavily on the charger type, quantity, and existing electrical infrastructure. Level 2 commercial chargers typically cost $3,000 to $8,000 per station installed, including electrical work. Level 3 DC fast chargers range from $50,000 to $150,000 or more per unit, depending on power output and required electrical upgrades. We provide detailed, site-specific quotes after our free electrical assessment.

Does my building need an electrical upgrade to support EV chargers?

It depends on your current panel capacity and the number of chargers you want to install. A single Level 2 charger draws 30 to 80 amps, while a Level 3 DC fast charger can draw 100 to 400 amps. If your building’s electrical service does not have sufficient spare capacity, we handle panel upgrades, service entrance replacements, and utility transformer coordination. Our site assessment identifies exactly what is needed before any work begins.

What is the difference between Level 2 and Level 3 EV chargers?

Level 2 chargers operate on 208 or 240 volts and deliver 7.2 to 19.2 kW of power, adding approximately 25 to 65 miles of range per hour. They are ideal for locations where vehicles park for several hours. Level 3 DC fast chargers operate on 480-volt three-phase power and deliver 50 to 350 kW, charging most vehicles to 80% in 20 to 45 minutes. Level 3 chargers require significantly more electrical infrastructure and are typically used at travel centers and fleet depots.

Can I generate revenue from commercial EV chargers?

Yes. Networked commercial EV chargers from manufacturers like ChargePoint and Blink include built-in payment processing via credit card readers and mobile applications. You set the per-kWh or per-session pricing, and the network handles billing and revenue distribution. Some businesses also qualify for utility demand response programs that provide additional revenue for participating in grid balancing during peak demand periods.

Are there incentives for commercial EV charger installation in Wyoming?

The federal government offers a tax credit of up to 30% (capped at $100,000 per station) for commercial EV charging equipment through the Alternative Fuel Vehicle Refueling Property Credit. Some utility companies also offer rebates for commercial charging installations. We help identify all applicable incentives during the proposal phase. Contact us at (307) 757-5553 or through our contact page to learn about current programs.

How long does a commercial EV charger installation take?

Level 2 commercial charger installations typically take two to five days for the electrical work, plus one to three weeks for permitting. Level 3 DC fast charger installations require four to twelve weeks total, including utility coordination, permitting, construction, and commissioning. Projects requiring electrical service upgrades or utility transformer changes may extend the timeline. We provide a detailed schedule during the proposal phase.