Moonlight Electric Solutions installs and upgrades industrial-scale electrical service entrances throughout Cheyenne and southeastern Wyoming. From 240V three-phase to 480V three-phase conversions, transformer installations, and complete service rebuilds, our team handles every aspect of the upgrade, including the utility-side coordination that determines your project schedule.

Service-entrance work has high consequences. The cutover affects your entire facility, the equipment is expensive and long-lead, and the work is performed at voltages that punish mistakes. We bring the discipline and utility relationships needed to deliver these projects on schedule and without surprises.

Service upgrades live or die on utility coordination. We file the paperwork early, build the utility relationship, and stage the work so the cutover window is the shortest part of the project.

Industrial growth in the Cheyenne corridor has driven demand for service upgrades: plants outgrowing their original 240V service, new equipment requiring 480V three-phase, and facilities expanding production capacity beyond their existing transformer rating. We serve plant managers and facility directors across Laramie County, the Cheyenne Logistics Park, and outlying industrial operations.

Our high-voltage work covers service-entrance upgrades, transformer additions and replacements, primary metering installation, secondary metering reconfigurations, and complete service rebuilds for facility expansions. Every project includes Rocky Mountain Power coordination, City of Cheyenne permitting, and as-built documentation for your records.

What you are really buying on a job this size is a crew that has done it before. Isaac spent years on federal power system upgrades overseas, where the cutover plan gets reviewed before anyone touches a conductor and the documentation has to stand up to an audit. That is the standard we hold service-entrance work to here in Cheyenne. We do not learn your facility on your dime, and we do not leave you guessing about the schedule. The single-line goes to the utility early, the long-lead gear gets ordered the day the scope is locked, and the outage window is planned down to the hour so your operation is back up when we said it would be.

High-Voltage Capabilities

Service Upgrade Services

01

480V Three-Phase Conversions

Upgrade an existing single-phase or 240V three-phase service to 480V three-phase. Includes transformer change-out coordination with utility, new service entrance, and interior distribution redesign.

02

Transformer Installation

Pad-mount and pole-top transformer installations coordinated with Rocky Mountain Power. Includes transformer pad construction, primary cable, and secondary connection.

03

Service Entrance Rebuilds

Complete rebuilds of aging service entrances: meter base, main disconnect, conductor replacement, and grounding system upgrades to current code.

04

Primary Metering

Coordination of primary metering installations for facilities at the threshold where primary metering offers utility rate advantages over secondary metering.

05

Capacity Upgrades

Increase service capacity from 200A to 400A, 400A to 800A, or larger. Includes load study, conductor sizing, and main breaker selection coordinated with utility transformer capacity.

06

Utility Coordination

Application paperwork, single-line diagram submittal, scheduling of utility transformer work, and field coordination with Rocky Mountain Power crews on the cutover day.

Installation Process

How Service Upgrades Work

01

Load Study and Capacity Analysis

We document existing demand, identify expansion loads, and calculate the new service size. We confirm available transformer capacity at the property and coordinate with Rocky Mountain Power on any utility-side upgrades required.

02

Engineering and Utility Application

We produce single-line diagrams, file the utility service application, and submit permit drawings to the City of Cheyenne. Utility-side work typically drives the schedule, so we file early.

03

Material Procurement and Pre-Cutover Work

We procure long-lead equipment (meter bases, main switchgear, conductors) and complete all interior work that can be done before the cutover. The goal is to minimize the actual outage window.

04

Cutover, Commissioning, and Documentation

We coordinate the cutover with the utility crew, energize the new service, transfer interior loads, and commission protective devices. You receive an as-built drawing package and inspection sign-off documentation.

Ready to Get Started?

Contact Moonlight Electric Solutions today for a free, no-obligation walkthrough. We look forward to working with you.

Frequently Asked Questions

High-Voltage Service FAQs

How long does a service upgrade typically take?

From signed contract to energized new service, most service upgrades run six to sixteen weeks. Utility transformer work and equipment lead times drive the schedule. The actual cutover window is typically a single weekend or planned shutdown, eight to twenty-four hours of facility outage.

Do you handle the utility coordination, or do I?

We handle all utility coordination including service application, single-line diagram submittal, transformer scheduling, and cutover-day coordination with Rocky Mountain Power. You may need to sign the utility service agreement, but the technical paperwork and scheduling is on us. We also track the transformer lead time, which is often the longest pole in the whole project, and keep you posted on it.

What is the cost of a 240V to 480V conversion?

Costs vary widely based on existing service size, distance from the utility transformer, and the scope of interior distribution changes required. The largest single variable is usually the utility side: whether Rocky Mountain Power can serve you from existing infrastructure or has to set a new transformer and extend primary to your site. After that it is the switchgear rating and lead time, the length of the feeder run, whether the conversion can be staged around production or needs a full shutdown, and how much interior distribution has to change to accept the new voltage. We provide a detailed written quote after the load study.

Why convert to 480V if 240V already runs my equipment?

Because current is what costs you copper and heat. At 480 volts the same horsepower draws roughly half the amps, so feeders get smaller, voltage drop over a long run stops being a problem, and motors run cooler and last longer. If you are adding large motor loads, a big compressor, welders, or a production line, the 240-volt service is usually the thing that caps how much you can install. Most industrial equipment is built for 480 three-phase anyway, so you stop paying for step-up transformers and buck-boost workarounds. The catch is that any remaining 240-volt and 120-volt equipment needs a transformer to serve it, and we account for that in the design rather than discovering it at cutover.

Will a service upgrade reduce my utility bill?

Often yes, primarily through demand charge reduction and access to more favorable utility rate schedules at higher service capacities. Some facilities also unlock primary-metering rates that meaningfully reduce per-kWh charges. We can model expected savings during the proposal phase.

Can you upgrade service while keeping production running?

For most facilities, yes, with a planned outage window. We pre-install the new service equipment alongside the existing service, run temporary feeders if needed, and execute the cutover during a planned shutdown. Continuous-process facilities sometimes require more elaborate temporary power schemes; we develop those plans during engineering.

Are you licensed for high-voltage work in Wyoming?

Yes. Isaac Garcia holds a master electrician license in Wyoming and Colorado, plus a City of Cheyenne master electrician license. We are licensed for service-entrance work up to 600V and coordinate with specialized medium-voltage contractors above that threshold. Call (307) 757-5553 to discuss your project.

How do you keep the cutover outage as short as possible?

By doing everything that can be done while you are still on the old service. We build the new service entrance, set the switchgear, pull conductors, and bench-test the protective devices all before the cutover day, so the only work left during the outage is the actual transfer. On most jobs that drops the live outage to a planned weekend or a single shift instead of days. We hand you the window in advance so you can schedule production around it.

Do you serve industrial sites outside Cheyenne?

Yes. We cover southeastern Wyoming and Northern Colorado from our Cheyenne base, including the Cheyenne Logistics Park, plants out toward Pine Bluffs and Burns, and Front Range industrial sites down through the Fort Collins and Greeley corridor. For a service-entrance project we come walk the site, document the existing service, and coordinate with whichever utility serves you, whether that is Rocky Mountain Power or Xcel Energy. Call (307) 757-5553 to set up a walkdown.

Ready When You Are

Request Your Free Service Upgrade Assessment


From load study through utility cutover, we deliver service upgrades on schedule and without surprises. Free site walkdown and detailed written proposal.